Complete electrical control system upgrade
Noble Electric Ltd. performed a complete electrical control system upgrade, in 21 days for Hudson Bay Mining, ABB Group.
- Two 50 MegaWatt 110,000ACV to 600DCV rectifier control systems replacements
- including control cabinets, firing boards, fiber optics for controls and firing systems
- over 4,000 terminations
Project was a critical component shutdown, requiring completion within a 12-day period.
Design-build Reed Lake mine shop and warehouse
Noble Electric Ltd. performed full electrical installation at a new mine shop and warehouse
- Design Build Project
- 4.16KV and 600V installation
- Project required completion in 21 days.
Additional electrical projects through-out surface operations in Flin Flon and Snow Lake mines
- 120V to 25KV installations and upgrades.
- PLC and DCS Upgrades
- General electrical projects for surface and underground operations.
Structured Cabling Best Practices for Data Centres in Steinbach
Structured Cabling Best Practices for Data Centres in...
Thermal Imaging Maintenance Checklist for Industrial Electrical Panels
Thermal Imaging Maintenance Checklist for Industrial...
Designing Redundant Generator Systems for Winnipeg Hospitals: Case Study
Designing Redundant Generator Systems for Winnipeg...