Complete electrical control system upgrade
Noble Electric Ltd. performed a complete electrical control system upgrade, in 21 days for Hudson Bay Mining, ABB Group.
- Two 50 MegaWatt 110,000ACV to 600DCV rectifier control systems replacements
- including control cabinets, firing boards, fiber optics for controls and firing systems
- over 4,000 terminations
Project was a critical component shutdown, requiring completion within a 12-day period.
Design-build Reed Lake mine shop and warehouse
Noble Electric Ltd. performed full electrical installation at a new mine shop and warehouse
- Design Build Project
- 4.16KV and 600V installation
- Project required completion in 21 days.
Additional electrical projects through-out surface operations in Flin Flon and Snow Lake mines
- 120V to 25KV installations and upgrades.
- PLC and DCS Upgrades
- General electrical projects for surface and underground operations.
Surge Protection Upgrades for Critical Municipal SCADA Nodes
Surge Protection Upgrades for Critical Municipal...
Load Bank Testing Requirements for Standby Generators in Cold Climates
Load Bank Testing Requirements for Standby Generators...
Design‑Build Electrical Approach for Tilt‑Up Warehouses in Selkirk
Design‑Build Electrical Approach for Tilt‑Up...