1 (204) 687-0475‬ duane@noble-electric.ca

Hudson Bay Mining – Mining Electric Company

Complete electrical control system upgrade

Noble Electric Ltd. performed a complete electrical control system upgrade, in 21 days for Hudson Bay Mining, ABB Group.

  • Two 50 MegaWatt 110,000ACV to 600DCV rectifier control systems replacements
  • including control cabinets, firing boards, fiber optics for controls and firing systems
  • over 4,000 terminations

Project was a critical component shutdown, requiring completion within a 12-day period.

 

Design-build Reed Lake mine shop and warehouse

Noble Electric Ltd. performed full electrical installation at a new mine shop and warehouse

  • Design Build Project
  • 4.16KV and 600V installation
  • Project required completion in 21 days.

 

Additional electrical projects through-out surface operations in Flin Flon and Snow Lake mines

  • 120V to 25KV installations and upgrades.
  • PLC and DCS Upgrades
  • General electrical projects for surface and underground operations.

Gallery