Complete electrical control system upgrade
Noble Electric Ltd. performed a complete electrical control system upgrade, in 21 days for Hudson Bay Mining, ABB Group.
- Two 50 MegaWatt 110,000ACV to 600DCV rectifier control systems replacements
- including control cabinets, firing boards, fiber optics for controls and firing systems
- over 4,000 terminations
Project was a critical component shutdown, requiring completion within a 12-day period.
Design-build Reed Lake mine shop and warehouse
Noble Electric Ltd. performed full electrical installation at a new mine shop and warehouse
- Design Build Project
- 4.16KV and 600V installation
- Project required completion in 21 days.
Additional electrical projects through-out surface operations in Flin Flon and Snow Lake mines
- 120V to 25KV installations and upgrades.
- PLC and DCS Upgrades
- General electrical projects for surface and underground operations.
Low‑Voltage Control Wiring Standards for Automated Food‑Processing Lines
Low‑Voltage Control Wiring Standards for Automated...
EV Fleet Charger Infrastructure for Winnipeg Delivery Depots
EV Fleet Charger Infrastructure for Winnipeg Delivery...
Hazardous Location Wiring Compliance for Manitoba Fuel Terminals
Hazardous Location Wiring Compliance for Manitoba...